Good inspection practice is good for ensuring the normal operation of crusher all year round. Regular maintenance and correct written record can not rely on memory alone. Pre-start and routine maintenance check can reduce stopping time. Extend the life of crusher. The following preparations should be done before the crusher starts:
Check that the lubricating oil used is correct and the lubricating system part is installed according to the requirements.
When using the oil pump driven by the motor separately, start the oil pump first. Open the check cover above the oil tank cover, check the return pipe in the tank, and confirm that the oil is in circulation. When the oil is in normal operation. At least half of the oil discharged from the pipeline.
If the crusher is equipped with an integral oil pump driven by the crusher, the pump must be filled with oil first, and before the crusher is started, the drive shaft holder must be filled with oil. Pour a certain amount of oil into the pump. This method is used only in the initial startup and after a longer interval. Under normal conditions. The one-way valve on the tank will keep the pump in an oil-filled state. After the shaft frame is filled with oil, the hose shall be connected to the tight connection. When the pump is initially started, the pump will be lubricated well at the drive shaft sleeve. The drive shaft holder must be filled with oil.
4,,Remove wooden wedges squeezed between broken linings for shipment.
Check the axial clearance. The drive shaft must be able to move 1. 2-1. 8 mm outside the ground freely along the axial direction, and finally check if there are any tool or equipment obstacles in the crusher. Are all joints and fasteners fastened, oil spills and other obstacles to crusher startup.
Use the hand disk drive shaft to check whether the broken wall and the rolling wall interfere, and whether there are any other mechanical obstacles. If the broken wall touches the acetabular wall, please refer to the instructions for adjusting the adjusting sleeve at the back of this chapter.
8.Point the main motor to confirm the correct steering of the drive shaft. The correct steering is to turn counterclockwise in the face of the large belt wheel end of the drive shaft. The direction of rotation is determined towards the drive end of the drive shaft, and the drive shaft cannot run in reverse direction.
Click to view cone crusher parts introduction
Hunan Fengwei Wear Parts Foundry, specializing in the production of domestic and foreign brands of crusher wear spare parts manufacturers, production of domestic brands, Hua Yang, Shan Bao, SBM brands such as crusher wear parts, spare parts, as well as foreign brands, Metso, Sandvik, TEREX and other import brands crusher spare parts, wear parts, mining quarry companies such as crusher wear parts of choice. We achieve cost-effective localization of imported spare parts, service users at home and abroad. The company can be matched with various brands of hydraulic crusher electric parts, sealing parts, standard parts and other accessories, can meet the needs of one-stop shopping for customers at home and abroad the demand.
Hunan Fengwei Wear Parts Foundry has thirty years of production experience, and years of experience in processing export products, products have been exported to the United States, Canada, Australia, Sweden, Finland, Russia, Ukraine and Southeast Asia and other countries and regions. Hunan Fengwei Wear Parts Foundry product using the original material, high-quality raw materials, casting and heat treatment process we have a unique thirty years production experience, to ensure complete interchangeability, and original spare parts with high quality and competitive price, provide quality products, quality services for the majority of users.
Hunan Fengwei Wear Parts Foundry wearable parts can be customized to map, and if there is no map, the company has professional mapping personnel to help you mapping, after customization
Contact:Sales Director: Eileen Cai ;
Email: sales@hnfwe.com;
Mobile telephone: +8618692872223